2015 · 4 Seasons country club, Ukraine
Assignment
Supply heating to three cottages with guest rooms, occupying approximately 500 m².
Technical solution
The original December 2015 article documents the commissioning of a 190 kW two-boiler heating plant. The scheme allowed for a future sauna connection and provisions for a swimming-pool water-heating heat exchanger with up to 100 kW of reserve capacity.
Documentary evidence
The original schematic and installation photos are preserved on the site. This example illustrates the connection between engineering documentation and practical commissioning.