15 Dec 2015 — Two-boiler heating plant schematic

In December 2015, a 190 kW boiler plant was commissioned at the 4 Seasons country club. It supplied heat to three guest cottages with a combined area of approximately 500 m².

The installation allowed for a future sauna connection. Outlets were also provided for a swimming-pool water-heating heat exchanger, with up to 100 kW of additional capacity envisaged.

Engineering schematic

190 kW boiler plant schematic

Installation photographs

Це слайдшоу вимагає JavaScript.

The original article also illustrated a retort burner in an Altep boiler.

Boiler retort burner

Original Russian article: 15.12.2015 — Монтажная схема котельной с двумя котлами.