Rehabilitation department refurbishment at Mykolaiv City Hospital No. 3 — UNOPS, 2025–2026

UNOPS · KARNO LLC · Mykolaiv, Ukraine · 2025–2026

In 2025–2026, KARNO LLC carried out the refurbishment of the second-floor rehabilitation and physical therapy department at Mykolaiv City Hospital No. 3, 97 Kosmonavtiv Street. The client was UNOPS, as part of a wider initiative to strengthen healthcare infrastructure in Mykolaiv with Danish support.

  • Second-floor rehabilitation and physical therapy premises
  • 2025–2026 — period of construction works
  • 30 April 2026 — formal taking-over of the works by UNOPS
  • My role — Project Manager for KARNO LLC
A KARNO construction worker wearing company-branded workwear performs installation work at Mykolaiv City Hospital No. 3
KARNO worker during refurbishment at City Hospital No. 3, February 2026.

The assignment

The department’s premises had seen little major modernization for decades. Refurbishment was required to improve the building services, interior finishes and accessibility for patients with reduced mobility. The project design provided for updated patient rooms, accessible bathrooms, specialist consultation rooms and physical therapy spaces.

Coordinating the works

KARNO’s construction team coordinated dismantling and refurbishment, the upgrade of building services, floor and wall finishes and installation of accessibility features. Delivery required close sequencing of building and engineering trades, material procurement, site safety management and quality inspections.

Worker installing a wall-mounted support handrail in the rehabilitation department corridor
Installing a corridor support handrail, March 2026.

For people recovering from injury or illness, practical accessibility matters: support handrails, suitable door openings and adapted bathrooms can make a meaningful difference to the usability of a medical environment.

Outcome

UNOPS issued the Taking-Over Certificate on 30 April 2026. The refurbished premises provide the physical infrastructure for the hospital’s rehabilitation services. Specialized medical equipment was procured separately within the broader UNOPS programme; it is not presented here as equipment supplied by KARNO.

Refurbished hospital corridor with updated flooring and support handrails
Second-floor corridor following refurbishment, March 2026.
Updated heating radiator and interior finishes in the hospital
Updated heating and interior finishes, March 2026.

My role

I served as Project Manager for KARNO LLC, coordinating project delivery, timelines, the site team and communication with the client. The case illustrates the demands of managing healthcare refurbishment, where quality must be assessed through both construction standards and patient usability.

Independent confirmation

See UNOPS — Strengthening healthcare in Mykolaiv and Mykolaiv Development Agency — healthcare upgrades. Construction photographs: KARNO LLC archive.

Українська · Русский